Locomotive Background
Hawthorn Leslie and Company was formed by the merger of the shipbuilder A. Leslie and Company in Hebburn with the locomotive works of R. and W. Hawthorn at St.Peter’s in Newcastle upon Tyne in 1886. The company manufactured locomotives to order for main line companies and later had a number of standard designs including 0-4-0 saddle tanks and fireless locomotives.
In 1937 Robert Stephenson of Darlington amalgamated with the locomotive works at Forth Banks to form Robert Stephenson and Hawthorns Ltd. By this time Hawthorn Leslie had built 2,783 locomotives.
The newly formed Robert Stephenson and Hawthorns became a subsidiary of the Vulcan Foundry in 1943 and Hawthorn’s 137-year connection with Forth Banks ended.
The Dapol model is based on the 0-4-0 saddle tanks built between 1899 and 1924. They were produced in large numbers and continued in a variety of industrial uses (included Iron works, collieries and power stations) until the early to mid 1970’s. Over 10 locomotives have made it into various states of preservation.
Specifications
· Finely moulded body with many separately added fine details
· DCC ready with NEXT-18 socket included—accessed via the lift off dicast saddle tanks
· DCC fitted & DCC Sound fitted models available
· Cast wheels with fine relief and appropriate colouring
· Die-cast compensated chassis and all wheel pick up
· NEM pockets as standard
· Powerful Coreless motor
· Accessory bag with spares and other optional detail
Related Product
Recently Viewed Products
Lovely beautifully detailed engine with smooth responsive drive at all speeds. Great sound effects. Can find no fault. Another great purchase from Dapol.
Very happy with the loco, no blemishes, runs perfectly, great value for money and quick postage, my only issue is the rear left crank pin came unwound In reverse, but have since tightened it up and has been fine so nothing major
While this model looks awesome and does have great details, it does not run very reliably. Mine requires that I clean the bearings continuously or it dies on the tracks. I run 2 hours, I clean bearings for 15 minutes. I run 2 hours, I clean bearings for 15 minutes. I wish Dapol would offer a retrofit wheel wiper keeper plate to make this thing run (for at least a few hours before having to clean it out).




























